Record the approved material, shot weight, machine, heating, rotation, cooling and demolding conditions for the sample. Changing the cooling strategy can change dimensional behaviour. Identify whether distortion occurs inside the mold, during removal or after the part stands unsupported. A holding fixture may be appropriate for a critical shape, but its use and measurement timing must be agreed. Investigate the complete history rather than correcting every dimensional issue with extra machining.
What to send for a useful review
- Resin grade, data sheet and batch traceability
- Nominal wall, minimum wall and inspection map
- Critical interfaces, datums and tolerance
- Test conditions and pass/fail limits
Agree acceptance before tooling
General guidance. Validate resin, geometry and assembly in actual operating conditions. This is not a product certification or production commitment.
Cleaning robots & scrubber tanks
Develop clean-water tanks, recovery tanks and bodies around your machine layout. The brochure describes a scrubber project with complex tooling, alignment fixtures and airtightness testing. Autonomous models need additional sensor, battery and service-access review.
Explore solution ↗