Project checklist,Project requirements Overall dimensions and installation space, "Critical interfaces, datums and tolerance", "Medium, concentration and contact duration", "Continuous, peak and minimum temperature", "Trial quantity, annual demand and schedule", Test conditions and pass/fail limits, "UV exposure, climate and colour stability", "Static load, impact, vibration and mounting", "Nominal wall, minimum wall and inspection map", "Resin grade, data sheet and batch traceability", "Texture, colour reference and visible surfaces", "Insert material, torque and pull-out load", "Cleaning agents, disinfection and access", "Gaskets, connections and leak test method", "Packed dimensions, protection and destination", "Mold ownership, maintenance and change control", "Sensor visibility, heat, grounding and shielding", "Target market, intended use and required evidence", VICTOR YANG,support@energyoriginal.com / +86 13601469017