Modular floor scrubber parts
The supplied brochure documents a project for an environmental equipment company in China. Its engineering brief highlights material selection, a complex integrated mold, accurate modular connections, shaping fixtures and air-tightness testing.

Agree acceptance before tooling
A comparable cleaning-machine project should define detergent exposure, clean/recovery tank interfaces, assembly datums and a reproducible leak-test method. Inspection after cooling and conditioning helps identify fit issues before assembly. Numerical tolerances, pressure limits and production volumes must be agreed for the new project; the source does not publish these results.
Applications ↗